Jet Drive Prep 02

Jet Drive Prep 02

Once the tooling gel is sprayed it is laminated…

09 08

until the mold is ready to be pulled from the plug.

10

The next photo shows the mold dry fitted in the mold of the boat.

11

More gel coat, sanding and buffing is required to produce the desired finish.

12

Once the mold is polished it is screwed into the mold of the boat and the seams are finished with wax filet.

14 13

This process takes a week to complete plus repairing the mold for the boat after removing the mold for the jet drive.

15

Back to part one